Newbuild Master Schedule Template (Gantt)

Share

Newbuild Master Schedule Template (Gantt)

newbuild-master-schedule.xlsx · XLSX file · 321.1 KB

⬇ Download

About this template

This template lays out a full newbuild schedule from contract signature through engineering, procurement, steel and hull construction, outfitting, painting, testing, launch and sea trials to delivery, as a live Gantt chart built entirely from Excel formulas and conditional formatting, not static images.

Start by entering your own Contract Effective Date in the header block; every date on the sheet shifts from that single cell. Then replace the sample WBS with your project's real tasks and edit each row's Start Date, Duration and Percent Complete, the bar redraws automatically (pale = planned duration, solid = completed portion), and milestone diamonds move with their Start Date.

Related Templates

Cost Impact Calculation Sheet Template

A structured cost build-up sheet for pricing a Variation Order: direct labour, materials, subcontract and design costs,…

Templates · DOCX · 48.8 KB

Variation Order Form Template

A ready-to-use Variation Order / Change Order form for ship newbuilding contracts, covering description of change, pric…

Templates · DOCX · 47.9 KB

Dock / Berth Occupancy Planner

An interactive 52-week planner for tracking which vessel occupies which dry dock, outfitting berth or repair berth thro…

Templates · XLSX · 307.7 KB