Newbuild Master Schedule Template (Gantt)

Share

Newbuild Master Schedule Template (Gantt)

newbuild-master-schedule.xlsx · XLSX file · 321.3 KB

⬇ Download

About this template

A one-sheet Excel master schedule for a newbuild vessel, running from contract effective date to delivery and flag registration. It is meant for yard planners and owner's project teams who need a single-page picture of the whole build, for example at contract stage or before the detailed schedule exists in MS Project or Primavera.

What's inside: a worksheet called "Master Schedule" with a header block for vessel, yard, owner, class society and the Contract Effective Date. The task table has nine columns (WBS, Task Name, Type, Duration in days, Start Date, Finish Date, Predecessor, % Complete, Responsible) and 48 sample rows in eight phases: engineering and design, procurement, steel and hull, outfitting, painting and coating, testing and commissioning, launch and sea trials, and delivery. Seven rows are milestones, including keel laying, launching and delivery. To the right is a 65-week grid drawn with conditional formatting: a pale bar for the planned span, a solid bar for the completed share and a diamond for milestones.

How to use it: type your contract date in the header, which relabels the weekly columns. Replace the sample tasks with your own, then enter a Start Date and Duration on each row; Finish Date is calculated. Update % Complete at each progress review and the solid part of the bar grows with it.

Limits: this is a spreadsheet, not a scheduling engine. The Predecessor column is a text reference, so moving one task does not push its successors, and changing the contract date moves the timeline scale but not the task start dates. There is no critical path or resource levelling. The sample durations are illustrative, not benchmarks for any vessel type.

Where this template is used

The Yacht Procurement Map: Yard Scope, Owner-Furnished Equipment and the Makers List

Lesson Yard scope, allowances or owner-furnished equipment: map who buys what, read the makers list and 'or equal', …

The Master Schedule for a Yacht Build: WBS, Long Leads and the Critical Path

Lesson A 30-month master schedule for an illustrative 48 m yacht: WBS, milestones, long leads, the paint window, tri…

Task Dependencies in MS Project: FS, SS, FF, SF and Lag/Lead Time Explained

Lesson The four task dependency types in Microsoft Project (Finish-to-Start, Start-to-Start, Finish-to-Finish and St…

Critical Path Method (CPM) Scheduling for Shipbuilding

Lesson Build a precedence network for a newbuild project, find the critical path by hand, and use float to protect t…

PMI-SP Domain 2: Schedule Planning and Development

Lesson Domain 2 is 31% of the PMI-SP exam: the 12 official tasks from WBS to PMB, CPM and float, PERT, resource leve…

How a Shipbuilding Contract Works: Price, Payments, Delays, Changes, Warranty and Termination

Article How a commercial newbuilding contract works in practice: price, milestone payments, refund guarantees, delay …

Getting Started with MS Project for Shipbuilding Schedules: Views, Baselines and Progress Reporting

Article A practical introduction to building and running a shipbuilding schedule in Microsoft Project, task hierarchy…

Hull Block Construction Sequencing and Critical Path Management in Ship Newbuilding Projects

Article Ship newbuilding remains one of the most complex project environments in heavy industry. A single vessel can …

Related Templates

Keel Deflection Survey Record & Profile Workbook

Free Excel workbook for keel sighting and deflection surveys during ship construction. Enter raw keel heights for up to…

Templates · XLSX · 479.9 KB

Yacht Procurement Matrix and Long-Lead Tracker (T13)

Excel procurement matrix for a yacht build: one line per package with scope owner (yard, allowance, owner-furnished), m…

Templates · XLSX · 312.2 KB

Owner Budget Tracker and Risk Register (T12)

Excel workbook for the owner-side budget of a yacht newbuild and the owner's risk register. The budget sheet tracks eve…

Templates · XLSX · 489.1 KB