Home › Documents › Templates
Templates

Yacht Procurement Matrix and Long-Lead Tracker (T13)

Share

Yacht Procurement Matrix and Long-Lead Tracker (T13)

yacht-procurement-matrix-long-lead-tracker-t13.xlsx · XLSX file · 312.2 KB

Download

About this template

Excel procurement matrix for a yacht build: one line per package with scope owner (yard, allowance, owner-furnished), makers list entry and 'or equal', certificate, who warrants, interface data dates, lead time and receipt buffer. Formulas give the latest safe order date, order float, delivery margin, maker warranty cover against the yacht warranty and a status per line, with counters for overdue orders, late interface data, missing certificates and warranty gaps. Blank sheet plus a 13-line example for the fictional 48 m yacht YP-48 at month 15 (illustrative, placeholder lead times).

Where this template is used

The Yacht Procurement Map: Yard Scope, Owner-Furnished Equipment and the Makers List

The Yacht Procurement Map: Yard Scope, Owner-Furnished Equipment and the Makers List

Lesson Yard scope, allowances or owner-furnished equipment: map who buys what, read the makers list and 'or equal', …

Related Templates

Shipyard Subcontract Agreement Template

An editable sample agreement between a shipyard and a subcontractor for one work package, such as steel and welding, pi…

Templates · DOCX · 162.1 KB

Ship Repair Agreement Template

An editable sample agreement between a shipowner and a repair yard for a drydocking or repair job based on a repair spe…

Templates · DOCX · 146.7 KB

Shipbuilding Contract Template (Newbuilding)

An editable sample contract between a buyer and a shipbuilder for one newbuilding vessel, written from scratch for proj…

Templates · DOCX · 154.6 KB

Become a sponsor

Tell us about your company and what you would like to advertise. Our team will contact you as soon as possible.

We use these details only to reply to your request. See our Privacy Policy.