Newbuild Cost Breakdown Structure

Newbuild_Cost_Breakdown_Structure_CBS.xlsx · XLSX file · 304.8 KB

⬇ Download

About this template

An Excel cost breakdown structure (CBS) for tracking a newbuild budget against commitments and spend. It is intended for yard cost controllers and project managers, and for owner's teams who want a simple category view of where the contract money is going.

What's inside: one worksheet, "Cost Breakdown", with a header for vessel, yard, total contract value and reporting date. The table has eight columns: CBS Code, Cost Category, Budget, Committed, Actual to Date, Remaining, % Spent and Notes. Ten top-level categories are pre-filled: hull structure and steel, machinery and propulsion, outfitting, electrical and automation, painting and coating, installation of owner-furnished equipment, class and certification, project management and engineering, yard overheads and facilities, and contingency. Each row carries sample figures and a short note, and the budgets add up to a sample contract value of USD 18.5 million. A total row sums the columns, and a clustered column chart below the table compares budget with actual spend for each category.

How to use it: enter your own contract value and split it across the categories, or replace the categories with your yard's cost codes. Update Committed as purchase orders and subcontracts are placed, and Actual as invoices are booked. Compare committed with budget on each row, because an over-commitment usually shows up there before it reaches actual cost.

Limits: Remaining (budget minus actual) and % Spent are calculated on each category row and in the total row, but Committed is not compared with Budget, so over-commitment is not flagged. There is a single level of breakdown, with no sub-codes, currency conversion or forecast-at-completion column.

Where this template is used

Owner-Side Budget, Contingency and Risk

Lesson The owner budget beyond the contract price: allowances, owner-furnished items, crew, insurance, contingency v…

Earned Value Management (EVM) in Shipbuilding: Tracking Cost and Schedule Performance

Article How Earned Value Management turns a shipbuilding schedule and budget into one honest number, Planned Value, E…

Standard Contracts in Ship Newbuilding and Repair

Article BIMCO's NEWBUILDCON and other standard contract forms give shipyards, owners and lenders a shared legal langu…

Related Templates

Keel Deflection Survey Record & Profile Workbook

Free Excel workbook for keel sighting and deflection surveys during ship construction. Enter raw keel heights for up to…

Templates · XLSX · 479.9 KB

Yacht Procurement Matrix and Long-Lead Tracker (T13)

Excel procurement matrix for a yacht build: one line per package with scope owner (yard, allowance, owner-furnished), m…

Templates · XLSX · 312.2 KB

Owner Budget Tracker and Risk Register (T12)

Excel workbook for the owner-side budget of a yacht newbuild and the owner's risk register. The budget sheet tracks eve…

Templates · XLSX · 489.1 KB