About this template
The illustrative 30-month master schedule for the fictional 48 m yacht YP-48: 8 WBS groups, 32 tasks, 43 links and 10 milestones, with the critical path driven by the links. Zip file containing an MS Project XML file: unzip it and open the XML in Microsoft Project via File > Open (file type XML Format). This is not an .mpp file; Project recalculates dates from your calendar on import. All durations are illustrative and must be replaced with your own.