Partner site
HomeDocuments › Templates
Templates

EVM (Earned Value) Tracker Template

Share

EVM (Earned Value) Tracker Template

evm-tracker.xlsx · XLSX file · 304.9 KB

⬇ Download

About this template

A ready-to-use Earned Value Management tracker built around a 12-category work breakdown (Engineering, Procurement, Steel & Hull, Outfitting, Testing, Delivery and more), with Planned Value, Earned Value, Actual Cost, Schedule Variance, Cost Variance, SPI and CPI all calculated live from Excel formulas, enter Planned %, Actual % and Actual Cost, and every downstream figure updates automatically.

Replace the sample work packages and contract value with your own project's WBS and budget, then update Planned %, Actual % and Actual Cost at each reporting cycle. The colour-coded Status column (On Track, Behind Schedule, Over Budget, Behind and Over Budget) flags problem areas at a glance, pair it with the Newbuild Cost Breakdown Structure template for a fuller cost-control picture.