About this template
An interactive 52-week planner for tracking which vessel occupies which dry dock, outfitting berth or repair berth throughout the year — new-construction, repair, outfitting and layup occupancies are colour-coded so conflicts and idle capacity are visible at a glance, with a sample five-berth, thirteen-vessel yard already filled in as a working example.
Replace the berths and vessels with your own yard's layout, then edit any occupancy's Start Date or Duration — the bar moves and resizes automatically, so a schedule change that creates a double-booking on the same berth shows up immediately instead of being discovered later. Useful alongside the Newbuild Master Schedule Template when a vessel's erection or outfitting dates shift and you need to check downstream berth availability.